Read demand before buying
Inspect the station's displayed power state and the equipment added since the last working state. The developer documents transformer upgrades, but no verified current wattage or price table is available here.
Backup is a different function
UPS batteries are documented as backup during a main-grid interruption. #14's multi-UPS placement correction does not establish a specific runtime, required battery count or unlimited backup.
Restored power, closed station
#1 corrected the station-opening state after power returned. If electricity is restored but the station behaves incorrectly, record that transition instead of assuming you must buy another capacity upgrade.
Patch evidence
Updated . Historical demonstrations retain their original dates; a patch label is not a numeric build ID.
Frequently asked questions
Does adding a UPS increase transformer capacity?
The cited developer material presents UPS backup and transformer capacity as different functions. It does not supply a conversion rule between them or a verified runtime table.
